We at RDP strive to build some of the most quality parts, locally, at super competitive hard to beat price points! We gaurantee you'll love how these transmissions drive and shift.
All of RDP's 5R110W 6.4L Powerstroke Upgraded Transmissions are setup and ready
for increased towing, upgraded performance and reliability. Whether you want to
be able to tow without worry, increase your power without stressing your stock
transmission will drop out of it, or just have a far more reliable and crisp
unit over stock, this one is for you.
Stage 4 Is also one of our Most Popular builds steps into one of the most built
units for extreme street and racing applications. Basically we add all of the
strongest most top of the line hard parts to this build.
RDP's Stage 4 6.4L Powerstroke 5R110W Transmission Always Come With:- Jet Washed and Cleaned
- Painted
- Full Tear down and Rebuild on Bench
- Full Raysbesto's Master Xtreme Rebuild Kit with GPZ Clutch Packs and Kolene Steels
Overhaul Gasket & Seal kit
Rubber molded pistons
5 O/D GPZ plates
5 Intermediate GPZ plates
5 Direct GPZ plates
2 Filters
All other necessary high performance plates
- Revised / Updated Valve Body with New Solenoids
- Sonnax Extreme Duty Billet Multi Disc Performance Torque Converter (TCS Built)
- Billet AERMET TCS Input Shaft
- Billet Intermediate Shaft
- Billet Reverse Hub
- Billet Planetary
- Case Saver Kit
- S/K 5R110W Shift Kit
- Upgraded Regulator Valve
- All Factory Spec Updated Upgrades
- All new Updated Solenoids
- New Modified Pump
- New Internal Filter / Pan Gasket
This Transmission is more of a performance transmission and works great with injectors ranging from Stock to 250cc, larger drop in turbos, t4 kits, fuel systems etc.
The weak point would be at this point for going past 250cc Injectors would
be considered the lack of further billet parts, such as Intermediate shaft, Billet Reverse Hub, Upgraded Aermet Billet Input Shaft etc.
Please check out our higher stages to get an all out performance transmission!
top of page
C$8,695.00Price
ETA 6 to 8 weeks lead time on all builds
bottom of page